The project involved the controlled internal deconstruction of office areas within Merchant Warehouse, a historic Grade II listed building in Manchester.
Stredder Demolition was responsible for removing a range of internal fixtures, fittings and installations, including flooring, glazed partition systems, office fixtures and specialist data room infrastructure.
Due to the listed status of the building, the works required a particularly careful approach.
Retained structural and architectural features had to be protected throughout the strip-out, with removal methods and sequencing planned to minimise the risk of damage to the existing structure.